8:20 AM
Bulletin (ATLANTA) DOWNTOWN CONNECTOR (I-75 / I-85) SOUTHBOUND BETWEEN 10TH ST NW (OVERPASS) AND UNIVERSITY AV SW ROAD CONSTRUCTION. THREE LANES CLOSED UNTIL 5/19/2008. LEFT LANES BLOCKED TILL 5:00 AM MONDAY. EXPECT MAJOR DELAYS. USE I-285, NORTHSIDE DRIVE, PEACHTREE ST, MONROE DR, OR PIEDMONT AVE AS ALTERNATES.
6:21 AM
Surface Street Conditions (COLLEGE PARK) I-85 NORTHBOUND BETWEEN I-285 (SOUTHSIDE PERIMETER) AND DOWNTOWN CONNECTOR / I-75 / I-85 10 MINUTE TRAVEL TIME
6:21 AM
Surface Street Conditions (ATLANTA) I-85 SOUTHBOUND BETWEEN I-75/I-85 (SOUTH END) AND SOUTHSIDE PERIMETER (I-285) 10 MINUTE TRAVEL TIME
6:21 AM
Surface Street Conditions (COLLEGE PARK) I-85 SOUTHBOUND BETWEEN SOUTHSIDE PERIMETER (I-285) AND HWY 34 20 MINUTE TRAVEL TIME
6:20 AM
Surface Street Conditions (HAPEVILLE/FOREST PARK) SOUTHSIDE PERIMETER (I-285) WESTBOUND BETWEEN I-75 AND I-85 5 MINUTE TRAVEL TIME
6:20 AM
Surface Street Conditions (COLLEGE PARK) SOUTHSIDE PERIMETER (I-285) EASTBOUND BETWEEN I-85 AND I-75 5 MINUTE TRAVEL TIME
6:20 AM
Surface Street Conditions SOUTHWEST PERIMETER (I-285) NORTHBOUND BETWEEN I-85 AND I-20 10 MINUTE TRAVEL TIME
6:20 AM
Surface Street Conditions (ATLANTA) SOUTHWEST PERIMETER (I-285) SOUTHBOUND BETWEEN I-20 AND I-85 10 MINUTE TRAVEL TIME
6:20 AM
Surface Street Conditions (FOREST PARK) SOUTHEAST PERIMETER (I-285) EASTBOUND BETWEEN I-75 AND I-20 10 MINUTE TRAVEL TIME
6:21 AM
Surface Street Conditions (CANDLER-MCAFEE) SOUTHEAST PERIMETER (I-285) WESTBOUND BETWEEN I-20 AND I-75 10 MINUTE TRAVEL TIME
6:23 AM
Surface Street Conditions I-75 NORTHBOUND BETWEEN SOUTHSIDE PERIMETER (I-285) AND LANGFORD PKWY (HWY 166) 5 MINUTE TRAVEL TIME
6:23 AM
Surface Street Conditions (ATLANTA) I-75 SOUTHBOUND BETWEEN I-85 (SOUTH) AND SOUTHSIDE PERIMETER (I-285) 5 MINUTE TRAVEL TIME
6:25 AM
Surface Street Conditions (PANTHERSVILLE/CANDLER-MCAFEE) I-20 (EAST EXPWY) WESTBOUND BETWEEN EASTSIDE PERIMETER (I-285) AND DOWNTOWN CONNECTOR (I-75/I-85) 10 MINUTE TRAVEL TIME
6:25 AM
Surface Street Conditions (ATLANTA) I-20 (EAST EXPWY) EASTBOUND BETWEEN DOWNTOWN CONNECTOR (I-75/I-85) AND EASTSIDE PERIMETER (I-285) 10 MINUTE TRAVEL TIME
7:08 AM
Surface Street Conditions (SMYRNA) TOP END PERIMETER (I-285) EASTBOUND BETWEEN I-75 AND I-85 15 MINUTE TRAVEL TIME
7:08 AM
Surface Street Conditions (DORAVILLE) TOP END PERIMETER (I-285) WESTBOUND BETWEEN I-85 AND I-75 15 MINUTE TRAVEL TIME
7:09 AM
Surface Street Conditions (ATLANTA) WESTSIDE PERIMETER (I-285) NORTHBOUND BETWEEN I-20 AND I-75 10 MINUTE TRAVEL TIME
7:09 AM
Surface Street Conditions WESTSIDE PERIMETER (I-285) SOUTHBOUND BETWEEN I-75 AND I-20 10 MINUTE TRAVEL TIME
7:13 AM
Surface Street Conditions I-85 SOUTHBOUND BETWEEN TOP END PERIMETER (I-285) (SPAGHETTI JUNCTION) AND I-75/ I-85- BROOKWOOD MERGE 10 MINUTE TRAVEL TIME
7:14 AM
Surface Street Conditions (ATLANTA) I-85 NORTHBOUND BETWEEN I-75 / I-85 (NORTH END) (BROOKWOOD) AND I-285 (NORTHSIDE) 10 MINUTE TRAVEL TIME
7:14 AM
Surface Street Conditions (SANDY SPRINGS) GEORGIA 400 (US 19) SOUTHBOUND BETWEEN I-285 AND I-85 5 MINUTE TRAVEL TIME
7:15 AM
Surface Street Conditions (ATLANTA) GEORGIA 400 (US 19) NORTHBOUND BETWEEN I-85 AND I-285 5 MINUTE TRAVEL TIME
8:05 AM
Surface Street Conditions (SMYRNA) I-75 SOUTHBOUND BETWEEN COBB CLOVERLEAF (I-285 E/W) AND I-85 (NORTH) 10 MINUTE TRAVEL TIME
8:06 AM
Surface Street Conditions (ATLANTA) I-75 NORTHBOUND BETWEEN I-85 (NORTH) AND TOP END PERIMETER (I-285) (CLOVERLEAF) 10 MINUTE TRAVEL TIME
8:08 AM
Surface Street Conditions (ATLANTA) I-20 (WEST EXPWY) EASTBOUND BETWEEN WESTSIDE PERIMETER (I-285) AND DOWNTOWN CONNECTOR (I-75/I-85) 5 MINUTE TRAVEL TIME
8:10 AM
Surface Street Conditions (ATLANTA) I-20 (WEST EXPWY) WESTBOUND BETWEEN DOWNTOWN CONNECTOR (I-75/I-85) AND WESTSIDE PERIMETER (I-285) 5 MINUTE TRAVEL TIME
8:11 AM
Surface Street Conditions (ATLANTA) DOWNTOWN CONNECTOR (I-75 / I-85) NORTHBOUND BETWEEN LANGFORD PKWY (HWY 166) AND I-75/I-85 BROOKWOOD SPLIT 10 MINUTE TRAVEL TIME
8:13 AM
Surface Street Conditions (ATLANTA) DOWNTOWN CONNECTOR (I-75 / I-85) SOUTHBOUND BETWEEN I-75/I-85 BROOKWOOD MERGE AND LANGFORD PKWY (HWY 166) 30 MINUTE TRAVEL TIME
2:22 PM
Roadwork (GOVERNMENT CENTER AREA) DOWNTOWN ATLANTA ROAD CONSTRUCTION ATLANTA GAS LIGHT (AGL) WILL REPLACE OLD PIPES UNDERNEATH STREETS FROM MAY 1 THROUGH AUGUST 30, 2008. AFFECTING NELSON ST SPRING ST FORSYTH ST PRYOR ST TRINITY AV GARNETT ST CASTLEBERRY ST MITCHELL ST CENTRAL AV BROTHERTON ST
6:10 AM
Ongoing Construction TURNER FIELD BASEBALL GAME ATLANTA BRAVES HOST THE OAKLAND ATHLETICS. FIRST PITCH SCHEDULED FOR 7:10 PM. AVOID DELAYS- USE I-285 (EASTSIDE PERIMETER) TO I-20 WESTBOUND TO ACCESS TURNER FIELD.
2:21 PM
Weather (MIDTOWN ATLANTA) WILLIAMS ST NW NORTHBOUND BETWEEN 10TH ST NW AND 16TH ST NW ROAD CONSTRUCTION. ROADWAY REDUCED TO ONE LANE UNTIL 10/1/2009. RE-BUILD OF THE 14TH ST OVERPASS, AND OTHER PLANNED DOWNTOWN CONNECTOR IMPROVEMENTS WILL BLOCK TWO LANES OF WILLIAMS STREET UNTIL SUMMER 2009. TRAFFIC IS DIVERTED EAST ONTO 10TH ST. NORTH ON W. PEACHTREE ST. AND WEST ON 16TH ST TO ACCESS I-75 NB
2:21 PM
Weather (ATLANTA) TECHWOOD DR NW SOUTHBOUND BETWEEN 16TH ST NW AND 10TH ST NW MAJOR ROAD CONSTRUCTION ALTERNATES TO TECHWOOD DRIVE: WEST OF I-75/85- NORTHSIDE DRIVE. EAST OF I-75/85: SPRING ST., WEST PEACHTREE ST, PEACHTREE ST.
2:21 PM
Weather (ATLANTA) I-75 SOUTHBOUND RAMP TO 14TH ST NW NO RAMP. MAJOR ROAD CONSTRUCTION . RAMP TO 14TH & 10TH STREETS CLOSED DUE TO ONGOING WORK, REPLACING 14TH ST BRIDGE AND ADDING NEW RAMPS TO AND FROM THE CONNECTOR TILL SUMMER 2009.// ALTERNATE- TAKE NORTHSIDE DR. TO 17TH ST. OR 10TH ST.
2:21 PM
Weather TECHWOOD DR NW SOUTHBOUND BETWEEN 16TH ST NW AND 10TH ST NW CLOSED DUE TO ROAD CONSTRUCTION TILL SUMMER 2009 FOR WORK ON THE 14TH ST. BRIDGE REPLACEMENT AND NEW RAMPS AT THE DOWNTOWN CONNECTOR. USE SPRING ST. OFF HWY 13/ BUFORD HWY CONNECTOR AS AN ALTERNATE OFF I-85 SB, OR OFF I-75 SOUTH, YOU CAN USE 16TH ST WEST TO NORTHSIDE DR.
2:21 PM
Weather (ATLANTA) I-85 SOUTHBOUND RAMP TO 14TH ST NW NO RAMP. CLOSED DUE TO ROAD CONSTRUCTION . RAMP TO 14TH & 10TH STREETS CLOSED DUE TO ONGOING WORK, REPLACING THE 14TH ST BRIDGE AND ADDING NEW RAMPS TO AND FROM THE CONNECTOR TILL SUMMER 2009// ALTERNATE- TAKE 17TH STREET WEST TO ACCESS WEST SIDE, OR EAST TO ACCESS EASTSIDE.
2:21 PM
Weather (ATLANTA) MITCHELL ST SW BETWEEN NORTHSIDE DR SW AND SPRING ST SW BRIDGE CLOSED DUE TO DEFICIENCY/ SAFETY CONCERNS
7:07 AM
Surface Street Conditions STONE MOUNTAIN FWY (US 78) EASTBOUND BETWEEN EASTSIDE PERIMETER (I-285) AND HUGH HOWELL RD 10 MINUTE TRAVEL TIME
7:07 AM
Surface Street Conditions STONE MOUNTAIN FWY (US 78) WESTBOUND BETWEEN HUGH HOWELL RD AND EASTSIDE PERIMETER (I-285) 10 MINUTE TRAVEL TIME
7:10 AM
Surface Street Conditions (GAINESVILLE MILLS) I-985 SOUTHBOUND BETWEEN QUEEN CITY PKWY (HWY 60) AND I-85 20 MINUTE TRAVEL TIME
7:10 AM
Surface Street Conditions (SUWANEE) I-985 NORTHBOUND BETWEEN I-85 AND QUEEN CITY PKWY (HWY 60) 20 MINUTE TRAVEL TIME
7:11 AM
Surface Street Conditions (DACULA) UNIVERSITY PKWY (HWY 316) WESTBOUND BETWEEN WINDER HWY SE AND I-85 15 MINUTE TRAVEL TIME
7:11 AM
Surface Street Conditions (GWINNETT COUNTY) UNIVERSITY PKWY (HWY 316) EASTBOUND BETWEEN I-85 AND WINDER HWY SE 15 MINUTE TRAVEL TIME
7:12 AM
Surface Street Conditions I-85 SOUTHBOUND BETWEEN HWY 20 (BUFORD DR) AND TOP END PERIMETER (I-285) (SPAGHETTI JUNCTION) 20 MINUTE TRAVEL TIME
7:14 AM
Surface Street Conditions I-85 NORTHBOUND BETWEEN I-285 (NORTHSIDE) AND HWY 20 (BUFORD DR) 20 MINUTE TRAVEL TIME
7:14 AM
Surface Street Conditions GEORGIA 400 (US 19) SOUTHBOUND BETWEEN HWY 20 AND I-285 20 MINUTE TRAVEL TIME
7:15 AM
Surface Street Conditions (SANDY SPRINGS) GEORGIA 400 (US 19) NORTHBOUND BETWEEN I-285 AND HWY 20 20 MINUTE TRAVEL TIME
2:21 PM
Ongoing Construction (DULUTH) SUGARLOAF CLUB DR AT MEADOW CHURCH RD NW GOLF TOURNAMENT . PGA GOLF / AT&T CLASSIC, THE TOURNAMENT PLAYERS CLUB AT SUGARLOAF THRU SUNDAY EVENING
3:22 PM
Ongoing Construction (ROSWELL-ALPHARETTA) OLD ROSWELL RD AT FOUNDERS PKWY CONCERT . THE EAGLES "LONG ROAD OUT OF EDEN" TOUR 8:00 PM AT THE NEW VERIZON WIRELESS AMPHITHEATRE
2:21 PM
Weather UNIVERSITY PKWY (HWY 316) WESTBOUND BETWEEN HWY 120 AND I-85 MAJOR ROAD CONSTRUCTION UNTIL 12/16/2008. MAJOR RECONFIGURATION OF THE I-85/ HWY 316 INTERCHANGE. EXPECT LANE CLOSURES AND MAJOR DELAYS DURING OFF PEAK HOURS ***WEATHER PERMITTING***. PROJECT TO BE COMPLETED BY WINTER 2008 (GWINNETT COUNTY)
2:21 PM
Weather STONE MOUNTAIN FWY (US 78) IN BOTH DIRECTIONS BETWEEN W PARK PL BLVD SW AND STONE DR SW MAJOR ROAD CONSTRUCTION RE-CONFIG AND REMOVING THE REVERSIBLE LANES 3 PERMANENT LANES WESTBOUND ONLY 2 EASTBOUND LANES AND 1 TURN LANE. POSSIBLE DELAYS EASTBOUND TRY HUGH HOWELL TO LILBURN-ST. MOUNT TO ARCADO TO KILLIAN HILL OR ROCKBRIDGE RD. TO ANNISTOWN RD TO ROSS RD AS ALTS.
2:21 PM
Weather (DULUTH) UNIVERSITY PKWY (HWY 316) EASTBOUND RAMP TO BOGGS RD NW NO RAMP. CLOSED DUE TO ROAD CONSTRUCTION . FOR AT LEAST TWO MONTHS, DUE TO CONTINUING WORK AT THE I-85/HWY 316 INTERCHANGE.